You don't have javascript enabled. Good luck with that.
Pencarian
Longsor, PHB Citra 2 Sepanjang 155 Meter Diperbaiki

SDA Accelerates Citra 2 Phb Channel Retaining Wall Repairs

The West Jakarta Water Resources (SDA) Sub-agency accelerates the collapsed Citra 2 Connecting (Phb) Channel's retaining wall as high as 355 centimeters on Jalan Citra 2 Extention, Pegadungan Urban Village, Kalideres Sub-district.

The progress so far has only reached about 30 percent

West Jakarta SDA Sub-agency's Maintenance Section Head Wawan said the retaining wall was collapsed along 65 meters on the left side and 90 meters on the right side.

Repair of Collapsed Sheet Pile on Jalan Nusa Indah Almost Complete

"We're currently repairing the left side that collapsed as long as 65 meters. It will be completed in the next two weeks," he stated, Wednesday (3/16).

His side deployed 15 personnel and one unit mini excavator to make repairs by installing 30-centimeters river stones, which have been carried out since March 3.

"The progress so far has only reached about 30 percent," he closed.

Linked News
Popular News indeks
  1. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye971 personAldi Geri Lumban Tobing
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye932 personAldi Geri Lumban Tobing
  3. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye822 personFakhrizal Fakhri
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye709 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye606 personAnita Karyati